Another week has come and gone, and I’m a week behind on my blogging — with pretty good reason, too!

My crew has been working really long days and straight through their weekends in order to keep up with production on the house, since the trades are all making huge advances these days, and there are a lot of pictures to prove it.

If this is the first time you’re dropping in to looking at this project, I’d suggest going back to the beginning of this amazing Rocky Mountains Italian lime Venetian plaster project in Banff, right here.

I’ve been loving the level of work from everyone involved in this project. Get a load of this amazing buffalo design in the stone flooring, at the main entrance.

It’s almost like a giant puzzle, isn’t it? I bet there’s a lot of people who’d love to put a puzzle this size together, but I sure wouldn’t. The precision needed to lay this tile is a pretty rare skill, even at this level of the game.

Talk about a mistake getting set in stone… Not for me, thanks. I’ll leave that to the pros.

Here’s another look at the stone buffalo, from the second floor.

A little trivia for you: Did you know that Alberta’s home to one of the two last continually wild North American buffalo herds?

After the Venetian plaster finish on the kitchen ceiling got polished off, other teams got to put the beams up. I’m loving the look and the contrast of the smooth wood against the rustic lightly-pitted plaster, but can’t wait to see it stained.

Another shipment of material showed up this week, which meant more walking up hills and stairs covered in snow, hauling plaster supplies.

Ahh, the boring world of drywall… but progress here means moving on to what we love, the plastering.

Details are critical with a masterful build like this one, where everyone’s brought their A++ game. Here’s Kelvin getting all those reveals smooth and level. It’s looking great, and we know he’ll keep it up.

The beams in the master bathroom are installed now, getting closer to a  finished look.

The outside of this place is getting just as much detail work as in the inside. Here are some shots of the exterior. Now this is some serious craftsmanship going on here.

Here’s one of my favourite areas of the whole build: the back patio, with its massive fireplace.

Can you imagine summer nights, friends, wine, a fire crackling, and those towering evergreens all around?

All work and no play makes Darrell and the boys unhappy. I’m no dummy, we can’t have that! No trip, not even a work one, to Banff, Alberta, is complete without hitting the local slopes. Here’s us, off to Sunshine Village for a little powder action.

Sometimes accidents happen… Would you believe a darn tree just jumped right out at me? 🙂

Thanks for sticking around as my epic work adventure continues.

Stay tuned for more soon!

Cheers,
Darrell Morrison

It’s great to be back in Banff!

The progress from other trades has been awesome! I’ve come back to see the millwork going up on our lime plaster ceilings in the dining room, and the drywall’s being installed throughout the home.

With such a positive start for the new year, we’ll have a super-productive month.

Having lost some time to travel early this week, we’ll be working straight through the weekend. We’ll be focusing on the kitchen, which means Venetian plastering the ceilings so we can finally take on the walls.

After arriving in town, we spent the week preparing all these areas for the next seven days of work. That meant we had to prime all the walls and ceilings, and float some walls to get them perfect and level so they’ll the right canvas for our work.

Old-school methods like floating walls don’t get a lot of talk on the home reno shows on TV, but they can really make the difference in the level of craftsmanship seen in work like ours.

Remember, we’re working with natural products like wood, and one warped 2×4 can mean a world of trouble for more than one trade on a job like this. Using today’s tools and yesterday’s know-how, our finishing techniques transform trouble spots that could make an elaborate plastering job like this seem less than perfect.

Sometimes, it’s what you don’t see at the end of the job that makes the difference between good work and great work.

Here’s the dining room. I can’t wait to see this room get further along!

The design is just amazing, and look at all the windows. I’m in love with the look of this space and keep trying to imagine the final result. With all the lines, the angles, the textures, the light, I know it will be stunning.

Below is a detailed shot of the first floor’s drop ceiling.

The architecture here blows me away, I can’t get enough of it! It demands that we spend way more time on the finishing work, sure, and our necks and shoulders are cramping up with the strain and effort it takes, but that’s the way it goes.

It’s honestly a privilege to work on such a high level of craftsmanship, in such an amazing natural setting, and if it takes an ice bag or two, that’s okay.

These ceilings are something else, aren’t they?

I think the slight sheen and subtle rustic texture bounce the light nicely while adding lots of character. What about you? Can you see this in a space for your project?

Can you imagine enjoying an Irish coffee, reading a mystery book, and the glow of a roaring fire casting shadows on this pitted ceiling? If you’re a designer, would your clients enjoy this?

Here’s a ceiling shot taken before the drywall was installed. You can really see the jagged edges and the revealed planks underneath.

Our work is literally cut out for us!

This is the biggest wall in the house, area-wise — and the tallest. We have an amazing design happening for this, which is carved in, with half-inch reveals. You don’t get to see how cool it looks until next week’s blog posting, though.

If you’re enjoying Week One of the exciting second phase of this big project in Banff, Alberta, then stick around for more excitement — now that almost all the prepping is done, you can expect to see change happening quickly and dramatically.

Stay tuned!

Wishing you a happy and healthy 2011,
Darrell Morrison


Guess what I’ve always dreamed of scratching off my bucket-list? Plastering a high-end commercial building.

Soon, I’ll be scratching it off! (Or I can change the bucket list to “super-big high-end commercial building,” maybe. Then, after that, add “downtown”.)

Starting April, 2011, I’ll be starting an amazing adventure with my team as we begin a massive lime plastering project in the Grandview Business Centre in South Surrey, BC.

It’s a great building, an important part of the new “Morgan Crossing” district, which is an area that has just exploded over the last two years.

The mall, The Shops At Morgan Crossing, has great businesses like the Steve Nash Sports Club and a favourite of mine, because we all love a good wine: the “Everything Wine Store”.

Located so close to the mall, the Business Centre’s a great location for professionals looking to be accessible and convenient for clients.

All right, let’s talk project details.

The Builder Double V Construction will be creating the blank canvas for this amazing project.

We’ll be putting lime plaster in all the common spaces (including lobbies, corridors, and washrooms) on the Morgan Crossing Business Centre’s 1st, 3rd, and 4th floors.

We’ve chosen the palette already.

The corridors will be a slightly polished sandy/cream-coloured lime plaster with subtle pitting and black flecks.

Washrooms will be treated with a cement-based plaster that incorporates subtle pitting, almost like a honed travertine, but seamless and free of any joints.

The lobby ceiling will have a shiny finish that resembles the look of polished marble.

I can’t wait to see so much of my work in one place. A lot of what I work on is in private homes, but this will be a project that I can “visit” for years to come — and close to home, too.

Stay tuned while I prepare for this awesome undertaking, because I plan to share the journey with you by blogging the process in words and video while things come to life.

Cheers,

Darrell Morrison